Build Duration

Does anybody know how many working days it actually takes to build a L494?

Thanks
Jas Current RRS: MY18 SVR
Previous RRS: MY15 RRS 5.0L Autobiography

Post #444126 Tue Dec 02 2014 12:39am
View user's profile Send private message View poster's gallery Reply with quote
Hugh Haddow



Member Since: 03 Jul 2009
Location: Prestwick
Posts: 202

Scotland 2013 Range Rover Sport 3.0 TDV6 HSE Bali Blue

According to the Land Rover book a car comes off the production line every 82 seconds.
As for how long it takes to 'build' it seems to depend on what you mean by build. The process is very fragmented.
If you mean to come down the production line and be 'assembled' then we (during a visit in 2012) were quoted 3 days for the Evoke. however I'm not sure where the beginning and end is. EG the body shell starts the 'line' built but without doors and screens. They come assembled.
Hope this helps. Please don't take it as factual.
Hugh

Post #444144 Tue Dec 02 2014 1:16pm
View user's profile Send private message View poster's gallery Reply with quote
spear



Member Since: 12 Apr 2014
Location: Notts
Posts: 22

United Kingdom 

I was quoted 3-4 weeks for the entire process including quality control etc.

Post #444161 Tue Dec 02 2014 4:59pm
View user's profile Send private message View poster's gallery Reply with quote
Violetpiano



Member Since: 03 Jun 2014
Location: London
Posts: 561

United Kingdom 

Thanks Guys,

My dealer told me that on the Vista System my car is showing as "Build Start" on 5 December and "Delivery to Dealer" on 19 December. I also thought that the process was 3 to 4 and was trying to ascertain how realistic it was to get my car before Christmas. As I suspected......probably not.

Jas Current RRS: MY18 SVR
Previous RRS: MY15 RRS 5.0L Autobiography

Post #444164 Tue Dec 02 2014 5:05pm
View user's profile Send private message View poster's gallery Reply with quote
Mark_N



Member Since: 09 Aug 2013
Location: London
Posts: 1102

United Kingdom 

It's a pretty spectacular process and I speak as someone whose idea of a good holiday is to visit a press shop.

When I was at Halewood, we were looking at coils of steel plate. As our guide said, these will be pressed this morning, built into a body shell this afternoon, painted overnight, final assembly tomorrow and out the door by tomorrow evening.

If you go to Solihull and you arrive first thing, you find yesterday's production clogging up all the available space and a car transporter has to leave at least every 10 minutes to clear them out. Drive down the M40 or A34 and you see transporter after transporter taking them down to Southampton. The value creation at Solihull is just incredible.

So, I think the total build time for an RRS from aluminium pressing to completed car is 2 - 3 days. Whether that means you will get your car before Christmas, I do not know but I wish you luck!! Mark

SVR in Estoril Blue Thumbs Up

Post #444169 Tue Dec 02 2014 6:01pm
View user's profile Send private message View poster's gallery Reply with quote
Violetpiano



Member Since: 03 Jun 2014
Location: London
Posts: 561

United Kingdom 

Cheers Mark Current RRS: MY18 SVR
Previous RRS: MY15 RRS 5.0L Autobiography

Post #444202 Tue Dec 02 2014 9:54pm
View user's profile Send private message View poster's gallery Reply with quote
dragon007



Member Since: 21 Jan 2015
Location: London
Posts: 22

United Kingdom 

Violetpiano wrote:
Thanks Guys,

My dealer told me that on the Vista System my car is showing as "Build Start" on 5 December and "Delivery to Dealer" on 19 December. I also thought that the process was 3 to 4 and was trying to ascertain how realistic it was to get my car before Christmas. As I suspected......probably not.

Jas


Dealer told me last weekend that it would take 4 months for delivery if I put an order in now.
He also said that 4 months was good - they'd actually sped things up.

Post #449275 Wed Jan 21 2015 4:50pm
View user's profile Send private message View poster's gallery Reply with quote
dragon007



Member Since: 21 Jan 2015
Location: London
Posts: 22

United Kingdom 

Violetpiano wrote:
Cheers Mark

So you got yours from within a month of putting the order in?

Post #449276 Wed Jan 21 2015 4:51pm
View user's profile Send private message View poster's gallery Reply with quote
viper



Member Since: 21 Apr 2007
Location: chester le street
Posts: 857

United Kingdom 2010 Range Rover Sport 3.0 TDV6 HSE Bali Blue

4 weeks Not much chance of that 4months is good going 2016 bmw x5 40d m-sport space grey
2015 bmw 335i m-sport touring mineral grey/coral interior looking to change again .
Gone HSE SDV6 Dynamic indus silver, santorini contrast roof,panoramic roof,red brakes,privacy,climate front seats,tow bar great car enjoyed it ����
Gone my10 3.0 tdv6 Bali blue/ivory 5 years 24k no problems great car will be missed

Post #449279 Wed Jan 21 2015 5:01pm
View user's profile Send private message View poster's gallery Reply with quote
Violetpiano



Member Since: 03 Jun 2014
Location: London
Posts: 561

United Kingdom 

dragon007 wrote:
Violetpiano wrote:
Cheers Mark

So you got yours from within a month of putting the order in?


Nope. I didn't say that. I actually ordered a L494 on 1st March 2013. When the car was launched in mid April that year, the dealer who I ordered it with wouldn't confirm that LR would be launching the model in a V8 Diesel (which their press release confirmed and that was what I wanted at the time), I cancelled my order. After having driven a Supercharged, I placed an order with another dealer around the end of 2013 but was told that I would have to wait up to 12 months. When I realised that my car would arrive around the September / October last year, I asked if I could put it back just a little to get a 2015 MY and that's what I took delivery of on 24 December Smile

Jas Current RRS: MY18 SVR
Previous RRS: MY15 RRS 5.0L Autobiography

Post #449429 Thu Jan 22 2015 9:02pm
View user's profile Send private message View poster's gallery Reply with quote
dragon007



Member Since: 21 Jan 2015
Location: London
Posts: 22

United Kingdom 

Ok fair enough.
4 months sounds good!
Now to get them to install Cat 5.

Post #449757 Sun Jan 25 2015 7:03pm
View user's profile Send private message View poster's gallery Post Reply
Post Reply  Back to top
Page 1 of 1
All times are GMT

Jump to  
Previous Topic | Next Topic >
Posting Rules
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



Site Copyright © 2005-2024 Futuranet Ltd & Martin Lewis
RRSPORT.CO.UK RSS Feed - All Forums

Switch to Mobile site